top of page

Evolugen to Host Series of Public Engagement Sessions on Fitzroy BESS, Starting Feb 23 at WCSS

Writer's picture: Ward 5 StaffWard 5 Staff

Updated: 3 days ago

Evolugen, the company proposing Fitzroy BESS facility, now targeted for South March, has announced it will host a series of public engagement sessions in the coming months. The next session will be an Open House on Sunday, February 23rd, 2025, from 1:00 pm to 6:00 pm at West Carleton Secondary School. A follow-up session is also planned for the week of March 3rd.

 

Evolugen says it plans to share a list of studies and reviews (see below) that it’s undertaking to inform City Staff and Council deliberations on the proposed projects.


Evolugen says it is committed to publicly releasing all of these materials, and is currently working on the publication schedule. Additionally, in an email sent to our office this week, Evolugen says it proposes to use Lithium Iron Phosphate (LFP) batteries in the proposed facility and that the site will be monitored on a 24/7 basis from its control centre in Gatineau.

 

From Evolugen: List of studies and reviews

 

Stakeholder Consultation - Consult with agencies the City of Ottawa has asked us to work with

Geotechnical Study - Design requirements for the subsurface conditions

Grading & Drainage Plan - Grading relationships between connecting (or abutting) properties and surface runoff control

Hydrogeological & Terrain - A scientific study or evaluation that includes a description of the ground and surface hydrology, geology, terrain, affected landform and its susceptibility

Site Servicing Study - Servicing details based on proposed scale of development with an engineering overview taking into consideration surround developments and connections

Impact Assessment Study - Heritage, Mineral Aggregate, Mining Hazards, Waste Disposal Sites

Emergency Response Plan - A detailed ERP to address fire mitigation & response

Landscape Plan - A plan to demonstrate how the canopy cover, urban design, health, and climate change objectives of Official Plan will be met through tree planting and other site design elements

Plan of Survey - Depicts legal boundaries and is a specialized map of a parcel of lands and it delineates boundary locations, building locations, physical features and other items of spatial importance

Preliminary Construction Mgmt Plan - A checklist that shows a development proposals anticipated impacts to all modes of transportation and all elements in the right of way during construction

Public Consultation Strategy - Proposal to reach and collect public input as part of the development application

Site Plan - Visual drawing that illustrates the proposed development of a site in 2 dimensions

Zoning Confirmation Report - Identify all zoning compliance issues, if any, at the outset of a planning application

Environmental Impact Study (EIS) - Assessment of enviro impacts of a project and documents the existing natural features, identifies the potential enviro impacts, recommends ways to avoid and reduce the negative impacts, and proposes ways to enhance natural features and functions

Tree Conservation Report - Demonstrates how tree cover will be retained and protected on the site, including mature trees, stands of trees, and hedgerows


Questions? Here's how to contact our office and stay up to date with Ward 5 issues:


Ward 5 | West Carleton-March

City of Ottawa | 613-580-2475

Follow us on Facebook, Twitter and Instagram

Subscribe to our Ward 5 Newsletter


 

220 views
bottom of page